Home / Equipment / CAT 345GC

2024 Caterpillar 345GC Excavator

871 hours. Cat diesel. Built in Japan. Standing in Qingdao, China at USD 125,000 as is.

2024 Caterpillar 345GC Excavator photo 1, Qingdao, China2024 Caterpillar 345GC Excavator photo 2, Qingdao, China2024 Caterpillar 345GC Excavator photo 3, Qingdao, China2024 Caterpillar 345GC Excavator photo 4, Qingdao, China2024 Caterpillar 345GC Excavator photo 5, Qingdao, China

About this machine

Forty three tonnes is the weight at which an excavator stops being a general purpose machine and becomes a production tool. The 345GC is bought by people who are paid for volume: quarry operators loading rigid trucks, contractors stripping overburden, and mining subcontractors who need a bench cleared on a schedule somebody else set. If your work is measured in cubic metres per shift rather than in jobs per week, this is the class that pays for itself.

What 871 hours means on a machine this size

A 345GC is built for tens of thousands of hours. At 871 it has not yet reached the point where a fleet manager would schedule its first serious component work. The undercarriage, which is the single largest running cost on a machine of this weight, is barely worn. That is the whole argument for buying at this hour count rather than at six or eight thousand, where the price looks better and the first year of ownership does not.

The GC line, and why it costs less than a 345 with letters after it

Caterpillar builds the GC variants for operators who want Cat reliability without the fuel maps, payload electronics and grade control that a large contractor in Europe or North America pays for. Fewer systems means fewer things to diagnose in a yard a long way from a dealer. For a buyer in Africa, the Middle East or South Asia that is usually an advantage rather than a compromise.

Matching it to trucks

A machine this size wants trucks it can fill in three to five passes. Pair it with a thirty tonne class truck and your cycle makes sense. Pair it with a small tipper and you will spend the day waiting for the next one to reverse in, which is the most common way contractors waste the capacity they just paid for.

Getting it to your port

At forty three tonnes this is a breakbulk or flat rack movement, not a container. The boom and arm come off for the voyage and bolt back on at the other end, which is ordinary work for any yard that handles heavy equipment. Tell us your discharge port and we price the actual sailing rather than quoting you a number from a table.

Before you commit

Come to Qingdao, or send somebody who knows these machines. Ask for a cold start, then put it on full hydraulic load and listen. Walk the undercarriage and look at the idlers and the sprocket teeth rather than the paint. We will film any of it for you first if a trip is not practical, including the hour meter with the machine running.

Other machines you might consider

2024 Doosan DX225 Excavator

USD 44,000 as is, Qingdao, China.

2024 Caterpillar 320D Excavator

USD 35,000 as is, Qingdao, China.

2024 Caterpillar 349D Excavator

USD 107,000 as is, Qingdao, China.

2023 SDLG 936L Wheel Loader

USD 24,000 as is, Qingdao, China.

Questions we are asked

Questions buyers ask us about this particular CAT 345GC.

About the 345GC

How big is a Caterpillar 345GC?+
Forty three tonnes operating weight, which puts it in the mass excavation and mining support class rather than general site work.
What work is a 43 ton excavator for?+
Quarry loading, overburden stripping, bulk earthmoving and anything measured in cubic metres per shift instead of jobs per week.
Is 871 hours a lot on a machine this size?+
No. A 345GC is designed for tens of thousands of hours, so at 871 it has not reached its first major service interval.
What does the GC in 345GC mean?+
It is Caterpillar's simpler specification, with fewer electronic systems than the full house models. Less to diagnose far from a dealer.
Where was this machine built?+
Japan, and it runs its original Caterpillar diesel.

Price and payment

How much is a used Caterpillar 345GC?+
Ours is USD 125,000 as it stands in Qingdao, with 871 hours on the meter.
Why is a 345GC cheaper than other 45 ton machines?+
The GC specification carries less electronics, and the price reflects that rather than any difference in the structure or the driveline.
How do I pay for a machine at this price?+
Seventy five per cent on confirmation, which reserves it and starts export preparation, and the balance before the vessel sails.
Who receives the money for a machine this size?+
Beaumont Investment Group, LLC in the United States, our parent company, which you can verify in public records before you send anything.

Shipping and arrival

Does a 43 ton excavator fit in a container?+
No. It travels on a flat rack or as breakbulk, with the boom and arm removed for the voyage and refitted on arrival.
What does it cost to ship a machine this heavy?+
It depends on the port and the sailing, so we price it against a real vessel rather than quoting from a table. Give us your port.
Can you deliver it to my site?+
We cover everything up to loading at the origin port. The inland leg is arranged by your own transporter, who knows the route and the permitted weights.

Checking it first

Can I inspect it before paying?+
Yes. Come to Qingdao yourself or appoint an inspector, and have them run it under full hydraulic load rather than just looking at it.
What should an inspector look at on a 345GC?+
The undercarriage first, idlers and sprocket teeth, then a cold start, then the boom and stick cylinders under load.

Tell us which machine and which port

Those two pieces of information are all we need in order to give you a real answer, and you will normally hear back from us on the same day.